Categories

Archives

LEO Cox-Mills # 11-2 currently being drilled Posted 2 May 2012 by mpg. Blog, MPG Updates

The LEO Cox-Mills 11-2 was spudded on April 24, 2012. As of May 1st, drilling depth was at 302 feet. Surface casing is planned to be set at 1,300 feet. T.D. is estimated to be reached the week of May 8th.

LEO Cox-Mills Drilling Rig 1 LEO Cox-Mills Drilling Rig 2

Leave a Reply